Wattlewood, Carrum Downs

As lead contractor Independent Demolition performed services isolations, extensive tree protection, hazardous materials removal and remediation and demolition of 76 residences on this site.

(Click an image to view full size)

Warragul Arts Centre, Warragul

Detailed demolition within existing building including removal of three-story brick and concrete blade walls, demolition within a theatre and orchestra areas and forming openings for lifts, doors and windows.

(Click on an image to view full size)

Special Operations Facility – Victoria Police, Ravenhall

Remediation, demolition and removal of special operations training facility including shooting ranges, factories and amenities.

(Click an image to view full size)

Carlton Primary School, Carlton

Independent Demolition was engaged to demolish portions of Carlton Primary School to make way for the Carlton Early Years and Family Services Centre.  The contract included hazardous materials removal and detailed demolition within an operating primary school. Demolition included façade and lift care and core removal.

(Click an image to view full size)

Kinnears Rope Factory

Independent Demolition worked as principal contractor on this site. The project included 7000m2 of asbestos roof removal and full demolition of two double-storey warehouses abutting busy public spaces. In collaboration with Just Eco Timber and Uneeda Bricks a large quantity of recycled products were salvaged and repurposed from this project.

A large amount of detailed demolition overseen by Heritage Victoria was also undertaken.

(Click an image to view full size)

112 Middleborough Rd

The project includes demolition of a partially constructed three-storey building including protection to the public and adjacent properties. The basement slabs and retaining walls remained and an engineered temporary steel support system was installed.

(Click an image to view full size)

Buckhurst St, South Melbourne

Independent Demolition were engaged by the City of Port Phillip as principal contractor to demolish the old Capi Water Warehouse at Buckhurst Street, South Melbourne to help facilitate Victoria’s first vertical school.  The warehouse and office abutted public spaces on all sides and included 2500m2 of asbestos roof and underground storage tanks.

(Click an image to view full size)

Windsor Terrance

This project consists of demolition of three double-storey town houses and a warehouse to the rear.  A steel retention system was constructed to maintain the High Street façade until construction of the new basement and townhouses was completed.

(Click an image to view full size)

CUB Brewery, Abbotsford

Full demolition of double-storey building inside the operating CUB distribution warehouse. This demolition included removal of three layers of ground slab and the bluestone roadway underneath to help facilitate a new cider manufacturing plant.

(Click an image to view full size)

Pentridge Prison

Shayher Properties appointed Independent Demolition to demolish the rock breakers yard on this heritage site. Extreme care was taken when returning items to the client and to avoid damage to the adjoining heritage structures.

(Click an image to view full size)